Rancho Alegre Phase I

Above and below grade excavation and construction of one story wood framed buildings.

Status

Bidding Closed

Bid Date3/4/19 2:00 pm

Company & Contacts

Frank Schipper Construction

Scott Jacobs   sjacobs@schipperconstruction.com

Location

2680 CA-154, SANTA BARBARA

This project consists of the following: Phase I rebuilding of one story wood framed buildings after damage in Whittier Fire. The buildings consist of the following:

  • (4) Dorm Buildings – 8520sf
  • (1) Health Center Lodge – 1125sf
  • (2) Outdoor School Staff Housing – 3510sf
  • (3) 2-bedroom Staff Housing (no garage) -2400sf
  • (2) 2-bedroom Staff Housing (with garage) – 1600sf
  • (1) 3-bedroom Staff Housing – 1100sf

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/39kp7ihp7mfefc78qj2xwk6pv1xlbodj

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com . We will have a hard copy set of plans in our plan room
This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs (sjacobs@schipperconstruction.com)

SCOPE OF WORK:
The scope of work includes foundation concrete, slab on grade concrete, masonry, rough carpentry, finish carpentry, cabinetry, insulation, SIPS Panels, waterproofing, metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead garage doors, windows, drywall, fiber cement siding, epoxy flooring, vinyl plank flooring, painting, staining, toilet accessories, fire extinguishers, signage, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical.

You can respond by clicking on one of the links above to let us know your intentions.

If you have any questions regarding this project, please contact me.

Thank you!
Erwin Villegas
(805) 963-4359
erwin@schipperconstruction.com