Sherwood Park Restroom Construction, No. DPW 17-15A

The work to be performed under this contract is generally described as the replacement of an existing restroom building with a City-supplied pre-fabricated restroom structure, all as shown on the Contract Documents and/or as specified herein. Contractor is responsible for coordination with the restroom manufacturer and meeting all site preparation requirements as listed in Technical Specifications Section 13 34 23 and fully described in the Contract Documents. Work is to be split into two phases. Phase 1 includes all work to prepare the site for the prefabricated structure. Phase 2 includes finish work to provide a completed restroom facility.

Status

Accepting Bids

Prebid Date3/15/19 10:00 am

Bid Date3/28/19 2:00 pm

Company & Contacts

City of Paso Robles, Public Works Dept.

Freda Berman, Maintenance Services Superintendent  

Location

290 SCOTT STREET, PASO ROBLES

Engineer’s Estimate: $112,000

Project files can also be downloaded at no charge here: http://www.ciplist.com/plan/?Paso%20Robles/city/12677/plan/2924