PROP 39 HVAC REPLACEMENT AT MAPLE HIGH SCHOOL AND EL CAMINO

Demolition of mechanical equipment, ducting & controls, and the installation of new mechanical equipment as shown on the mechanical drawings and described in the notes. Contractor shall remove mechanical equipment and ducting and recycle or dispose of in a legal manner. Contractor shall furnish and install and make operable and test all mechanical equipment shown on the plans, and shall also furnish and install all necessary devices, hardware and systems required to make said equipment properly and safely operable, including but not limited to mounting hardware, insulation, filters, duct systems and control systems.

Status

Accepting Bids

Prebid Date3/11/19 2:00 pm

Bid Date3/25/19 2:00 pm

Company & Contacts

City of Lompoc

Project Manager   (805) 736-2371

Location

4010 Jupiter Avenue, 320 North J Street, Lompoc

Beginning at Maple High School, 4010 Jupiter Avenue, Lompoc. We will meet in front of the school. All participants are required to sign in. Following the visit at Maple High School, we will proceed to El Camino, 320 North J Street, Lompoc. The site visits are expected to take approximately 1½ to 2 hours, in total. Failure to attend or tardiness will render bid ineligible.

Maple High School:
- Twelve Furnaces with soffit closets at classrooms
- One Furnace at the Administration Building

El Camino:
- Fifteen Furnaces with closets
- Two Furnaces with closets and ducted system (Rms 4 and 6A/6B)
- Two Furnaces at Building D
- One Furnace at the MPR Building with new controls and dampers