El Rio Iron and Manganese Treatment Plant Phase 1, 20-03

Installation of engineered fill and associated grading and site work, construction of a five (5) million gallon per day (MGD) iron and manganese treatment facility with horizontal pressure filters, chlorine system modifications, air scour system, washwater recovery tank, filter drain pump station, washwater recovery pump station, waste solids pump station, appurtenant building with a laboratory, yard piping and associated vaults, electrical, instrumentation, programming, testing and startup.

Status

Accepting Bids

Prebid Date6/2/21 9:00 am

Bid Date6/22/21 2:00 pm

Company & Contacts

United Water Conservation District

Adrian Quiroz   805-210-8294 or adrianq@unitedwater.org

Location

3651 North Rose Avenue, Oxnard

The Engineer’s Opinion of Probable Construction Cost for this project is $8.9 Million Dollars