Paso Robles Municipal Airport Electrical Upgrades, DPW NO. 19-18

Removal and replacement of airfield lighting circuit conductors, edge lights, isolation transformers, guidance sign upgrades, removal and replacement of precision approach path indicators (PAPI), apron area lighting fixture and conductor replacement, installation of a back-up power generator and airfield electrical vault revisions.

Status

Accepting Bids

Prebid Date6/4/21 10:00 am

Bid Date6/24/21 2:00 pm

Company & Contacts

City of Paso Robles, Public Works Dept.

Ditas Esperanza, Capital Projects Engineer  

Location

4912 Wing Way, Paso Robles

Engineer’s Estimate: $ 1,048,470.00

A non-mandatory pre-bid conference has been scheduled for Friday, June 4, 2021 at
10AM. It will be held at the Paso Robles Municipal Airport, located at 4912 Wing Way,
Paso Robles, CA.