Washington ES Roofing Replacement Project (REBID)

The work of the project consists of alterations to the existing school buildings A, B, C, D and E that shall consist of but are not limited to the following: 1. Reroofing (full roofing replacement). 2. Replacement of skylights made necessary by the reroofing work. 3. Rough carpentry, patching & repairs associated with and made necessary by the reroofing work. 4. Incidental electrical work, associated with and made necessary by the reroofing work.
Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Date Size
01 G1.0_REBID Washington 3/29/2022 747.0 KB
02 G2.0_REBID Washington 3/29/2022 518.4 KB
03 A0.1_REBID Washington 3/29/2022 742.8 KB
04 A0.2_REBID Washington 3/29/2022 1.0 MB
05 A1.1_REBID Washington 3/29/2022 834.8 KB
06 A1.2_REBID Washington 3/29/2022 785.8 KB
07 A2.1_REBID Washington 3/29/2022 854.0 KB
08 A2.2_REBID Washington 3/29/2022 1.2 MB
09 A3.0_REBID Washington 3/29/2022 687.1 KB
10 A3.1_REBID Washington 3/29/2022 1.1 MB
11 A3.2_REBID Washington 3/29/2022 4.6 MB
12 A3.3_REBID Washington 3/29/2022 1.3 MB
13 A4.1_REBID Washington 3/29/2022 855.7 KB
14 A4.2_REBID Washington 3/29/2022 874.8 KB
15 1 of 5_REBID Washington 3/29/2022 931.3 KB
16 2 of 5_REBID Washington 3/29/2022 837.2 KB
17 3 of 5_REBID Washington 3/29/2022 953.9 KB
18 4 of 5_REBID Washington 3/29/2022 909.5 KB
19 5 of 5_REBID Washington 3/29/2022 766.2 KB