Alterations and New Classroom Building at Monte Vista Elementary School, HSD #16-19-22/23

The Project description includes, but not limited to the following: (Part A) 1.) Replacement of existing roofing (including covered walkways) at Buildings A, B, C, D, E & Multipurpose. 2.) Replacement of existing windows and exterior storefront at Buildings A, B, C, D, E & Multipurpose. 3.) Replacement of existing HVAC at Buildings A, B, C, D, E & Multipurpose, including construction of new mechanical closets and installation of condensing units and equipment screens on existing roofs. 4.) Alterations to existing restrooms and drinking fountains at Buildings A, B, D & Multipurpose. (Part B) 5.) Construction of a single-story four-classroom building, including associated site work, structural, mechanical, plumbing, electrical, and fire alarm work, etc. at the Monte Vista Elementary School site.
Addendum 1, Part A (click to expand/collapse)
Addendum 2, Part A (click to expand/collapse)
Addendum A (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
MV Part A - Alterations_A#03121940_Addendum A_2023-01-23 7.1 MB
MV Part B - New Classroom Bldg_A#03-122004_Addendum A_2023-01-23 13.8 MB
Addendum B (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
MV Part A - Alterations_A#03-121940_Addendum B_2023-02-09 124.8 KB
MV Part B - New Classroom Bldg_A#03-122004_Addendum B_2023-02-23 4.6 MB
Addendum C (click to expand/collapse)