MUSD Library/Media Center HVAC Upgrade #2122-1

REMOVAL OF EXISTING BOILER/CHILLER HVAC AND INSTALLATION OF VRF HVAC IN THE MEDIA CENTER. ASSOCIATED UNINSTALLATION AND REINSTALLATION OF CEILING AND WALL FINISHES REQUIRED TO COMPLETE THE INSTALLATION. REMOVAL OF EXISTING CONCRETE MECHANICAL CURBS AND REPLACEMENT WITH NEW CONCRETE MECHANICAL EQUIPMENT CURBS.

Status

Accepting Bids

Prebid Date1/27/22 9:00am

Bid Date2/15/22 2:00pm

Company & Contacts

Montecito Union School District

Leo Perez   (805) 969-3249

Location

385 San Ysidro Rd, Montecito