MUSD Library/Media Center HVAC Upgrade #2122-1

REMOVAL OF EXISTING BOILER/CHILLER HVAC AND INSTALLATION OF VRF HVAC IN THE MEDIA CENTER. ASSOCIATED UNINSTALLATION AND REINSTALLATION OF CEILING AND WALL FINISHES REQUIRED TO COMPLETE THE INSTALLATION. REMOVAL OF EXISTING CONCRETE MECHANICAL CURBS AND REPLACEMENT WITH NEW CONCRETE MECHANICAL EQUIPMENT CURBS.
Drawings (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Date Size
01 T-1.0_MUSD HVAC 1/10/2022 648.7 KB
02 A1.0_MUSD HVAC 1/10/2022 315.2 KB
03 A2.0_MUSD HVAC 1/10/2022 353.8 KB
04 A3.0_MUSD HVAC 1/10/2022 232.5 KB
05 M0.0_MUSD HVAC 1/10/2022 264.9 KB
06 M0.1_MUSD HVAC 1/10/2022 238.8 KB
07 M1.1_MUSD HVAC 1/10/2022 227.8 KB
08 M2.1_MUSD HVAC 1/10/2022 228.3 KB
09 M3.1_MUSD HVAC 1/10/2022 210.3 KB
10 M5.1_MUSD HVAC 1/10/2022 957.3 KB
11 M5.2_MUSD HVAC 1/10/2022 1.0 MB
12 M5.3_MUSD HVAC 1/10/2022 187.6 KB
13 E0.0_MUSD HVAC 1/10/2022 2.5 MB
14 E0.1_MUSD HVAC 1/10/2022 3.6 MB
15 E0.2_MUSD HVAC 1/10/2022 1.7 MB
16 E1.0_MUSD HVAC 1/10/2022 388.6 KB
17 E2.0_MUSD HVAC 1/10/2022 477.8 KB