Outdoor Learning Pavilion Increment 02

Installation of a concrete foundation and landing at the restroom building and repair of adjacent decomposed granite walk. Grading of the area around the building to provide drainage per plan and relocation of existing boulders on site. Completion of utility connections under a separate contract. Provide signage and door stops.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2223-1 Addendum 01 671.1 KB
2223-1_Addendum 02-1 126.8 KB