Public Projects

Bids Due in 6 days
7/17/25 12:00pm
Terminal Reservoir Rehab
Bids Due in 6 days
Montecito Water District
Terminal Reservoir - 500 Block of East Mountain Drive, Santa Barbara
Reservoir seismic retrofit and replacement project for Terminal Reservoir.
Bids Due in 12 days
7/23/25 3:00pm
Bid 717 Ventura College STEM Program Building Re-Bid
Bids Due in 12 days
Ventura County Community College District
4900 Loma Vista Road, Ventura, CA 93003
This scope of work is a summary and is not intended to limit work described in the construction documents with exception of specific items listed by another contractor. This project includes all site preparation, utility connections, and associated infrastructure improvements to receive a new 2,880 square-foot modular building, to be fabricated, delivered, and assembled by American Modular Systems. Scope of work includes demolishing and clearing the site, constructing concrete foundations with AMS-provided anchorage embeds, vent wells, and access grates, installing a crawlspace mud slab and vapor barrier, performing site work including walls, paving, and landscaping, installing utilities to the building points of connection, and completing electrical and low voltage systems, including fire alarm, as indicated in the construction documents.
Bids Due in 18 days
7/29/25 10:00am
Bid No. 711, Exterior Painting (Multiple Locations)
Bids Due in 18 days
Oxnard Union High School District
Rio Mesa High School, 545 Central Avenue, Oxnard, CA 93036.
Furnishing all labor, materials, tools, equipment, and supervision to complete exterior surface preparation and painting
Bids Due in 20 days
7/31/25 2:00pm
Groundwater Monitoring Wells for Buellton Wastewater Treatment Plant
Bids Due in 20 days
City of Buellton
City of Buellton's City Hall, 107 W. Highway 246, Buellton, CA 93427
The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor and incidentals as required by this request for informal bid and the plans and specifications prepared by Wallace Group/Cleath-Harris Geologists dated May 2025. The general items of work to be done hereunder consist of the following the complete and satisfactory construction, and development, of three groundwater monitoring wells specified herein.