Outdoor Learning Pavilion Increment 01, 2122-5

Site accessible path of travel work, site utility work and outdoor countertops and skins as indicated in drawings. Concrete pad and minor site grading. Connection of new sewer and water lien to R.O.W. Electrical and data conduits.
Specifications (click to expand/collapse)
Name Date Size
03-122011_INC 01_SPC_A 5/8/2022 2.1 MB