Alterations and New Classroom Building at Monte Vista Elementary School, HSD #16-19-22/23
The Project description includes, but not limited to the following: (Part A) 1.) Replacement of existing roofing (including covered walkways) at Buildings A, B, C, D, E & Multipurpose. 2.) Replacement of existing windows and exterior storefront at Buildings A, B, C, D, E & Multipurpose. 3.) Replacement of existing HVAC at Buildings A, B, C, D, E & Multipurpose, including construction of new mechanical closets and installation of condensing units and equipment screens on existing roofs. 4.) Alterations to existing restrooms and drinking fountains at Buildings A, B, D & Multipurpose. (Part B) 5.) Construction of a single-story four-classroom building, including associated site work, structural, mechanical, plumbing, electrical, and fire alarm work, etc. at the Monte Vista Elementary School site.
Addendum 1, Part A
(click to expand/collapse)

Name | Size | |||
MV Part A - Alterations_A#03-121940_Addendum 1_2023-02-22 | 5.3 MB |
Addendum 2, Part A
(click to expand/collapse)

Name | Size | |||
MV Part A - Alterations_A#03-121940_Addendum 2_2023-02-22 | 2.1 MB |
Addendum A
(click to expand/collapse)

Addendum B
(click to expand/collapse)

Addendum C
(click to expand/collapse)

Name | Size | |||
MV Part A - Alterations_A#03-121940_Addendum C_2023-02-23 | 3.0 MB |