REPLACEMENT FLOORING AT TUNNELL ELEMENTARY SCHOOL MULTIPURPOSE ROOM AND KITCHEN (5267)
Replace District-Provided Flooring in the Multipurpose room and awarded contractor to provide, and install Epoxy flooring in the Kitchen. The anticipated start date is June 19, 2023.
| Filetype Icon | Name | Size | Order |
|---|---|---|---|
| 1.4 MB | |||
| 547.2 KB | |||
| 501.8 KB | |||
| 699.6 KB | |||
| 248.9 KB | |||
| 95.6 KB | |||
| 511.0 KB |
