SEWER MAIN EXTENSION & SEPTIC TANK ABANDONMENT PROJECT
Extend existing sewer main 375 LF and connect to existing building sewers; additional minor water line work.
Drawings
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Final plan set SBNC with signature for bid | 16.2 MB | ||
| SBNC Meter Relocation Plan - Offsite Sheet-Updated_8-12-23 | 50.0 KB | ||
| SBNC Onsite Water Service Line Plan | 173.9 KB |
