Remove existing aggregate ballast (approx. 5,150 sq ft) and replace with membrane roof system, remove and replace metal coping, and all ancillary work. Additionally, there is one additive alternate bid. Alternate bid one includes removal and replacement of existing domed skylights with curbs, and removal and replacement of removable skylights.
Status
Accepting Bids
Prebid Date | 6/26/25 11:00am |
Bid Date | 7/10/25 3:00pm |
Location
6363 N. Ventura Ave, Ventura
The Engineer’s Estimate is approximately $500,000, including the add alternate bid item.