Asphalt Parking Lot Reconstruction
Pulverizing the existing asphalt in place; watering, regrading, and compacting the pulverized material to 95% compaction; installing 3 inches of new hot asphalt; rolling to smooth and compact; applying fog seal; repainting all existing parking lines and stencils; and resetting concrete wheel stops.
Bid Package
(click to expand/collapse)

Name | Size | ||
9_5 FINAL TF Village_Bid Packet_ASPHALT[90] copy 3 | 969.8 KB |