Moorpark College LM HVAC Replacement, Bid 723
1. REMOVE THREE MULTI-ZONE TRIPLE DECK AIR HANDLERS. 2. INSTALL THREE MULTI-ZONE TRIPLE DECK HEAT PUMP AIR HANDLERS. 3. INSTALL TWO 20" Ø FLEXIBLE DUCTS FOR IMPROVED RETURN AIR FLOW. 4. UPGRADE CONTROLS 5. AIR BALANCE EXISTING AIR DISTRIBUTION SYSTEMS 6. CLEAN EXISTING DUCTING. BUILDING TYPE III 1HOUR NOT SPRINKLERED 2ND FLOOR 18,693 FT2 TOTAL 32,445 FT2 TITLE SHEET 7. REMOVE AND RE-INSTALL EXISTING UV LIGHT ASSEMBLIES.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 03_-125525_spc_a | 1.3 MB |