Washington ES Roofing Replacement Project (REBID)

The work of the project consists of alterations to the existing school buildings A, B, C, D and E that shall consist of but are not limited to the following: 1. Reroofing (full roofing replacement). 2. Replacement of skylights made necessary by the reroofing work. 3. Rough carpentry, patching & repairs associated with and made necessary by the reroofing work. 4. Incidental electrical work, associated with and made necessary by the reroofing work.
Addenda (click to expand/collapse)
Order this section for $0.00
Download section as a Zip file free of charge
Order files below for $0.00 each
Name Date Size
2002_Washington_REBID 3_Addendum 1_2022-03-29 3/29/2022 3.7 MB
2002_Washington_REBID 3_Addendum 2_2022-04-14 4/13/2022 477.9 KB