Washington ES Roofing Replacement Project (REBID)
The work of the project consists of alterations to the existing school buildings A, B, C, D and E that shall consist of but are not limited to the following: 1. Reroofing (full roofing replacement). 2. Replacement of skylights made necessary by the reroofing work. 3. Rough carpentry, patching & repairs associated with and made necessary by the reroofing work. 4. Incidental electrical work, associated with and made necessary by the reroofing work.
Addenda
(click to expand/collapse)
Name | Date | Size | ||||
2002_Washington_REBID 3_Addendum 1_2022-03-29 | 3/29/2022 | 3.7 MB | ||||
2002_Washington_REBID 3_Addendum 2_2022-04-14 | 4/13/2022 | 477.9 KB |